NON-STANDARD LIGHTING CUSTOM FLOW


Step 1:Project early communication to understand the clients concept

Step 2:Lighting Planning to confirmation of preliminary design

Step 3:Project discussion and provide preliminary solution

Step 4:Optimization adjustment solution

Step 5:Confrim the details drawing and color chart sample

Step 6:Discussion the business terms of delivery and payment

Step 7:Recieved the advance payment

Step 8:Formal production

Step 9:Double verified the site lighting pool size and technical specifications

Step 10:Deepen the final confirmation of the details drawing

Step 11:Suggestions and guidance for the pre embedded parts and reinforcement of ceiling

Step 12:Preparation,welding,surface treatment and assemble testing

Step 13:Carry out factory inspection and safety test before installation of lamps

         (high voltage grounding test,leakage prevention test)

Step 14:Technology installation or guidance installation at site

Step 15:After-sales service follow up and after-sale lamp maintenance and repair.

         (Procedure can be advanced or postponed,depending on the Project requirements and 

         the communication between the two sides)